Brief history of Oredo EPF Capacity Enhancement/Debottlenecking Project
- The project is about the capacity increase of the plant from 70mmscf/d to 100mmscf/d
- To achieve this, OBAX will be replacing the existing HP Separator vessel and the MP Heater Treater vessel with new highly engineered, and bigger vessels.
- OBAX will also be introducing a third vessel called a drain vessel to will improve the plant process operations.
- OBAX will also be introducing new upgraded Electrical and instrumentation devices to boost operation and monitoring process efficiency.
- OBAX will also be introducing a new test header manifold to improve the piping network and facility maintenance work.
BRIEF HISTORY OF OREDO EPF CAPACITY ENHANCEMENT/DEBOTTLENECKING PROJECT
- The project is about the capacity increase of the plant from 70mmscf/d to 100mmscf/d
- To achieve this, OBAX will be replacing the existing HP Separator vessel and the MP Heater Treater vessel with new highly engineered, and bigger vessels.
- OBAX will also be introducing a third vessel called a drain vessel to will improve the plant process operations.
- OBAX will also be introducing new upgraded Electrical and instrumentation devices to boost operation and monitoring process efficiency.
- OBAX will also be introducing a new test header manifold to improve the piping network and facility maintenance work.